“Update On: Tune And Chromaticity Measurements During The 10 A/s Ramp(S)”. FiDeL Working Group: CERN, 2010. doi:SOURCE.
. “Update On: Tune And Chromaticity Measurements During The 10 A/s Ramp(S)”. LHC Beam Commissioning Working Group: CERN, 2010. doi:SOURCE.
. “Proposed Commissioning Of Beam-Based Feedback Systems”. LHC Beam Commissioning Working Group: CERN, 2009. doi:SOURCE.
. “Residual Tune Stability”. LHC Beam Commissioning Working Group: CERN, 2009. doi:SOURCE.
. “Status Of Tune, Chromaticity, And Coupling Measurements”. LHC Beam Commissioning Working Group: CERN, 2009. doi:SOURCE.
. “Third Ramp To 1.18 Tev”. LHC Beam Commissioning Working Group: CERN, 2009. doi:SOURCE.
. “Third Ramp To 1.18 Tev - Video”. LHC Beam Commissioning Working Group: CERN, 2009. doi:
. “Lhc Base-Band-Tune (Bbq) And Q' Measurement Systems”. CERN, 2008. doi:
. “Lhc (Beam 2) Commissioning - Bpm, Q, Q' Instrumentation And Diagnostics”. Machine Advisory Committee: CERN, 2008. doi:SOURCE.
. “Lhc (Beam 2) Commissioning Status - Bpm, Q, Q' Instrumentation And Diagnostics”. LHC Commissioning Meeting: CERN, 2008. doi:SOURCE.
. “Lhc Beam-Based Feedbacks On Orbit, Energy, Tune, Chromaticity And Betatron Coupling”. AB Seminar: CERN, 2008. doi:SOURCE.
. “Lhc Global Aperture Measurements”. LHC Commissioning Working Group, Machine Protection Working Group: CERN, 2008. doi:SOURCE.
. “Lhc Tune And Chromaticity Diagnostic And Feedback Control Systems”. BI Commissioner Training: CERN, 2008. doi:SOURCE.
. “Lhc Tune And Chromaticity Diagnostic And Feedback Control Systems”. LTC - LHC Technical Committee: CERN, 2008. doi:SOURCE.
. “Orbit-Fb, Wcm And Ht Status”. BI Commissioner Training: CERN, 2008. doi:SOURCE.
. “Classification And Detection Of Lhc Bpm Errors And Faults”. LHC Commissioning Working Group: CERN, 2007. doi:SOURCE.
. “Lhc Feedbacks On Tune, Chromaticity And Betatron Coupling”. Chamonix: CARE Workshop on Schottky, Tune and Chromaticity Diagnostic & Feedbacks, 2007. doi:SOURCE.
. “Lhc Interaction Point Stability - Or: "how Well Do We Know The Beam Line"”. Accelerator Alignment Workshop: CERN, 2007. doi:SOURCE.
. “Overview Of Foreseen Feedbacks And Implications For Commissioning”. LHC Commissioning Working Group: CERN, 2007. doi:
. “Sps Prototype Tests For The Baseline Lhc Q' Measurement”. Machine Advisory Committee: CERN, 2007. doi:SOURCE.
. “Feedback Architecture And Commissioning At The Lhc”. Tune Feedback Final Design Review: Brookhaven National Laboratory, 2006. doi:SOURCE.
. “Feed-Forward/feedback Required”. Chamonix XV: CERN, 2006. doi:SOURCE.
. “First Results Of The Pll Tune Tracking In The Sps”. Tune Feedback Final Design Review: Brookhaven National Laboratory, 2006. doi:SOURCE.
. “Lhc - A Glimpse On 2007”. DPG Bad Honnef: Graduate's Seminar of the RWTH Aachen, 2006. doi:SOURCE.
. “Lhc Orbit Stability During Β* Squeeze”. LHC Collimation Working Group: CERN, 2006. doi:SOURCE.
.